• EN
  • RU
    • Introduction
      • The chairman’s statement
      • General director’s statement
      • Key events of 2015
    • Interactive analysis
    • 1. About the company
      • 1.1. Сompany’s profile
      • 1.2. Organisational structure of PJSC RusHydro
      • 1.3. The RusHydro group structure
      • 1.4. Geography activities
      • 1.5. Awards 2015
    • 2. Strategic review
      • 2.1. The company’s strategy
      • 2.2. Risk management
      • 2.3. The financial performance
      • 2.4. Investments
      • 2.5. Innovative development
      • 2.6. The company on the securities market
    • 3. Business review
      • 3.1. Business model
      • 3.2. Electricity and capacity market overview
      • 3.3. Tariff regulation
      • 3.4. Operational results
      • 3.5. International cooperation
    • 4. Corporate governance
      • 4.1. Corporate governance system
      • 4.2. Governing bodies
      • 4.3. External and internal control
      • 4.4. Report on remuneration to the management and control authorities
      • 4.5. Business ethics and anti-corruption
    • 5. Sustainable development
      • 5.1. Sustainable development management
      • 5.2. Interaction with Stakeholders
      • 5.3. Personnel and social policy
      • 5.4. Safety and environmental protection
      • 5.5. Energy efficiency
      • 5.6. Charity
    • Management Viewpoint
    • Contacts
    • Glossary of key terms and abbreviations
    • Responsibility Statement
    • Download Annual Report in PDF
    • 2015 RusHydro Appendices Book

      Chapter 3
      BUSINESS REVIEW

      3.4. Operational results

      Events of 2015

      • Installed capacity increased by 217.8 MW (+0.6 %) to 38,652.0 MW.
      • Output rose by 5362.5 GW (+4.5%) to 127,379.9 GW.
      • Electricity sales growth – by RUB 1,904.4 million.
      • The reservoir of Boguchanskaya HPP filled to a design level; the plant reached its design capacity of 2,997 MW and design mode of station operation.
      • A unique 14-kilometer tunnel for Zaramagskaya HPP-1 was finished.
      • Sayano-Shushenskaya HPP increased its maximum output capacity to the power grid to 5,100 MW due to the modernisation of its automation system.
      • 14 hydroelectric units with a total capacity of 1,171 MW were replaced and modernised.

      RusHydro production assets

      NameGeneration (million kW·h)Productive supply (million kWh)Installed capacity (MW)
      201320142015201320142015201320142015
      The Bureiskaya HPP6584.76065.95830.36431.95921.25690201020102010
      The Zeyskaya HPP6859.86427.84280.76610.66186.84043133013301330
      The Novosibirskaya HPP2400.32117.92092.52376.32096.62068.8460460465
      TheSayanp-Shushenskaya Cascade of HPPs24875.320374.62062624774.920270.420454.1672167216721
      The Kamskaya HPP1984.81998.42463.81953.41967.42433.8537543549
      The Votkinskaya HPP2527.42792.53210.92475.82735.83148.2102010201020
      The Upper Volga Cascade of HPP1643.1863.3723.31607.9838.3702.6466.6476.6476.6
      The Nizhegorodskaya HPP1870.61281.21168.71844.21259.71149.8520520520
      The Cheboksarskaya HPP2291.31889.61632.62230.31833.61578.3137013701370
      The Zhigulevskaya HPP 11705.410484.110398.311600.31038010307.1236223832404
      The Saratovskaya HPP6001.75599.65560.35895.75504.65469.1136913781391
      The Volzhskaya HPP1283911565.910999.412685.811416.610870.826292639.52650
      The Zagorskaya PSPP1490.41859.71841.51440.218081791.4120012001200
      The Kubanskaya Cascade HPPs1484.21383.61299.11455.61353.51271.3476.5476.5476.5
      Karachaevo-Cerkessia branch4701.7336.2466.9-1331.1160.6160.6160.6
      Kabardno-Balkaria branch575.2564.7478.7567.4556.7471.2157.5157.5157.5
      North Ossetia branch*357.5293.4267.4352287.7261.394.594.594.5
      Dagestan branch5208.64014.14196.85161.43970.24156.21785.51785.51885.5
      Total91169.479578.177406.489930.678385.97619824669.324725.824881.3
      The Kolymskaya HPP1923.81558.41672.81880.71516.31628.1900900900
      The Ust-Srednekanskaya HPP120.9372.9280.5116360.6267.8168168168
      Geothermal Power Plant 392.4405.5409.7359.5371.8376.4626262
      The Pauzhetskaya GeoPP41.942.342.334.635.234.813.613.613.6
      JSC IEC 467.9474.7453.4458.6465.3444.3561.4561.4561.4
      The Kamchatka HES*37.238.83935.737.537.824.824.824.8
      The Boguchanskaya HPP 4897.18361.713076.84862.88306.912995199829972997
      CJSC Blagoveshchenskaya CHP120
      RAO Energy Systems of the East Group30000.831155.933970.225779.727246.329831.99070.98981.78924
      Total129051.5121988.3127350.9123458.3116725.7121814.237467.938434.238652

      3.4.1. Installed capacity

      The total installed capacity grew by 217,8 MW to 38,7 MW in 2015. The decrease in capacity of the RAO Energy Systems of the East Group by 57.7 MW was compensated by the commissioning of Gotsalinskaya HPP ( with the capacity of 100.0 MW) and Blagovesсhensk CHP (120.0 MW of capacity).

      The growth of installed capacity also happened due to equipment remarking:

      • Novosibirskaya HPP – by 5.0 MW;
      • Kamskaya HPP – by 6.0 MW;
      • Zhigulevskaya HPP – by 21.0 MW;
      • Volzhskaya HPP – by 10.5 MW;
      • Saratovskaya HPP – by 13.0 MW.

      RusHydro Group has always occupied the first position in the rating of installed capacity among Russian power suppliers. The implemented investment programme gives grounds to expect it to save its leading position.

      Installed capacity31,
      MW

      e_3-4-1-a

      RusHydro electricity
      production dynamics33, GW

      e_3-4-1-b

      RusHydro electricity supply dynamics33, GW

      e_3-4-1-c

      3.4.2. Electricity output

      In 2015 electricity output grew by 5.36 billion kW·h (+ 4.5%) to 127,3 billion kW·h. Decrease of the electricity output of Zeyskaya HPP (-2,15 billion kW·h) was compensated for by the growth of the output of Boguchanskaya HPP (+ 4,72 billion kW·h) and at the plants of RAO Energy Systems of the East Group (+ 2,81 billion kW·h).

      3.4.3. Electricity and capacity sales

      For 2015 net sales of electricity and capacity by branches of PJSC RusHydro, which takes into account the purchase of electricity and capacity costs, increased by 2.9% y-o-y and amounted to 91 952.8 million rubles. The main factors that influenced the increase in revenue due to lower volume of electricity production by 2.7%:

      • the growth of the DAM price in the second price zone due to:
      • the growth of capacity purchase price at the КОМ for second price zone HPPs due to the liberalisation of the HPP capacity market dd. 05/01/2014;
      • the indexation of adjustable electricity and capacity tariffs;
      • the decrease of the amount and cost of purchasing electricity.

      RusHydro net revenues changes, RUB mn

       20142015ChangesChanges,%
      Sales107,296.8105,923.0-1,373.9-1.3
      - Cost of electricity sold76,532.473,262.4-3,269.9-4.3
      - Cost of capacity sold30,678.232,582.61,904.46.2
      - Services of Regional Distribution Grid Company86.377.9-8.4-9.7
      Purchasing expenses17,975.513,970.2-4,005.3-22.3
      - Cost of electricity purchased17,965.113,957.3-4,007.8-22.3
      - Cost of capacity purchased10.412.92.423.2
      Net revenue89,321.391,952.82,631.52.9

      3.4.3.1. Electricity sales

      Revenues in the DAM occupy the first position in the structure of the electricity sales revenues of the branches of PJSC RusHydro. Thereby, its share grew from 77.5% to 81.9% (+ 5,7%) in 2015 against the decrease of sales as per free bilateral contracts (FBC) by 29.% and the decrease of the volume of electricity sold in the balancing market (BM) by 7.1%.

      RusHydro electricity sales and dynamics, RUB million

      e_3-4-3-1-a
      e_3-4-3-1-b

      3.4.3.2. Capacity sales

      The main part of revenue from sales of capacity by the branches of PJSC RusHydro is formed by contracts signed within the CPA. Following the results of 2015, the share of such contracts grew from 54.6% to 55.2% with the growth of corresponding revenue by 7.5%. 46 % growth was registered as per contracts on capacity provision. In 2015, revenue went down by 21% as per free bilateral contracts.

      Capacity electricity sales and dynamics RUB million

      e_3-4-3-2-a
      e_3-4-3-2-b

      Optimisation and increase of efficiency of operating activities

      Pursuant to directive of the Government of Russian Federation no. 2303p-P13 dated 04/16/2015 on the decrease of operating costs (expenses), RusHydro Group implements a complex of measures aimed at the reduction of the index of the decrease of operating costs (expenses) by at least by 2% per annum starting from 2015.

      The total effect of the implementation of such actions in 2015 (adjusted to meet inflation) against 2014 amounted to RUB 1.89 billion (adjusted to meet the actual rate of inflation), including RUB 0.64 billion of PJSC RusHydro (-3.9%) and AO – RUB 1.25 billion.

      The total scheduled effect of the implementation of actions on the reduction of operating costs in 2016

      Bln RUB % of the level of 2015 including
      inflationary expectations
      PJSC RusHydro 3.73 (-14 %)
      PJSC RAO Energy Systems of East 5.23 (-7 %)
      TOTAL by the Group 8.96 -9.20%

      RUB billion

      operational expenditures
      decreasing

      3.5.
      International Cooperation