- Installed capacity increased by 217.8 MW (+0.6 %) to 38,652.0 MW.
- Output rose by 5362.5 GW (+4.5%) to 127,379.9 GW.
- Electricity sales growth – by RUB 1,904.4 million.
- The reservoir of Boguchanskaya HPP filled to a design level; the plant reached its design capacity of 2,997 MW and design mode of station operation.
- A unique 14-kilometer tunnel for Zaramagskaya HPP-1 was finished.
- Sayano-Shushenskaya HPP increased its maximum output capacity to the power grid to 5,100 MW due to the modernisation of its automation system.
- 14 hydroelectric units with a total capacity of 1,171 MW were replaced and modernised.
RusHydro production assets
Name | Generation (million kW·h) | Productive supply (million kWh) | Installed capacity (MW) | ||||||
---|---|---|---|---|---|---|---|---|---|
2013 | 2014 | 2015 | 2013 | 2014 | 2015 | 2013 | 2014 | 2015 | |
The Bureiskaya HPP | 6584.7 | 6065.9 | 5830.3 | 6431.9 | 5921.2 | 5690 | 2010 | 2010 | 2010 |
The Zeyskaya HPP | 6859.8 | 6427.8 | 4280.7 | 6610.6 | 6186.8 | 4043 | 1330 | 1330 | 1330 |
The Novosibirskaya HPP | 2400.3 | 2117.9 | 2092.5 | 2376.3 | 2096.6 | 2068.8 | 460 | 460 | 465 |
TheSayanp-Shushenskaya Cascade of HPPs | 24875.3 | 20374.6 | 20626 | 24774.9 | 20270.4 | 20454.1 | 6721 | 6721 | 6721 |
The Kamskaya HPP | 1984.8 | 1998.4 | 2463.8 | 1953.4 | 1967.4 | 2433.8 | 537 | 543 | 549 |
The Votkinskaya HPP | 2527.4 | 2792.5 | 3210.9 | 2475.8 | 2735.8 | 3148.2 | 1020 | 1020 | 1020 |
The Upper Volga Cascade of HPP | 1643.1 | 863.3 | 723.3 | 1607.9 | 838.3 | 702.6 | 466.6 | 476.6 | 476.6 |
The Nizhegorodskaya HPP | 1870.6 | 1281.2 | 1168.7 | 1844.2 | 1259.7 | 1149.8 | 520 | 520 | 520 |
The Cheboksarskaya HPP | 2291.3 | 1889.6 | 1632.6 | 2230.3 | 1833.6 | 1578.3 | 1370 | 1370 | 1370 |
The Zhigulevskaya HPP | 11705.4 | 10484.1 | 10398.3 | 11600.3 | 10380 | 10307.1 | 2362 | 2383 | 2404 |
The Saratovskaya HPP | 6001.7 | 5599.6 | 5560.3 | 5895.7 | 5504.6 | 5469.1 | 1369 | 1378 | 1391 |
The Volzhskaya HPP | 12839 | 11565.9 | 10999.4 | 12685.8 | 11416.6 | 10870.8 | 2629 | 2639.5 | 2650 |
The Zagorskaya PSPP | 1490.4 | 1859.7 | 1841.5 | 1440.2 | 1808 | 1791.4 | 1200 | 1200 | 1200 |
The Kubanskaya Cascade HPPs | 1484.2 | 1383.6 | 1299.1 | 1455.6 | 1353.5 | 1271.3 | 476.5 | 476.5 | 476.5 |
Karachaevo-Cerkessia branch | 470 | 1.7 | 336.2 | 466.9 | -1 | 331.1 | 160.6 | 160.6 | 160.6 |
Kabardno-Balkaria branch | 575.2 | 564.7 | 478.7 | 567.4 | 556.7 | 471.2 | 157.5 | 157.5 | 157.5 |
North Ossetia branch* | 357.5 | 293.4 | 267.4 | 352 | 287.7 | 261.3 | 94.5 | 94.5 | 94.5 |
Dagestan branch | 5208.6 | 4014.1 | 4196.8 | 5161.4 | 3970.2 | 4156.2 | 1785.5 | 1785.5 | 1885.5 |
Total | 91169.4 | 79578.1 | 77406.4 | 89930.6 | 78385.9 | 76198 | 24669.3 | 24725.8 | 24881.3 |
The Kolymskaya HPP | 1923.8 | 1558.4 | 1672.8 | 1880.7 | 1516.3 | 1628.1 | 900 | 900 | 900 |
The Ust-Srednekanskaya HPP | 120.9 | 372.9 | 280.5 | 116 | 360.6 | 267.8 | 168 | 168 | 168 |
Geothermal Power Plant | 392.4 | 405.5 | 409.7 | 359.5 | 371.8 | 376.4 | 62 | 62 | 62 |
The Pauzhetskaya GeoPP | 41.9 | 42.3 | 42.3 | 34.6 | 35.2 | 34.8 | 13.6 | 13.6 | 13.6 |
JSC IEC | 467.9 | 474.7 | 453.4 | 458.6 | 465.3 | 444.3 | 561.4 | 561.4 | 561.4 |
The Kamchatka HES* | 37.2 | 38.8 | 39 | 35.7 | 37.5 | 37.8 | 24.8 | 24.8 | 24.8 |
The Boguchanskaya HPP | 4897.1 | 8361.7 | 13076.8 | 4862.8 | 8306.9 | 12995 | 1998 | 2997 | 2997 |
CJSC Blagoveshchenskaya CHP | 120 | ||||||||
RAO Energy Systems of the East Group | 30000.8 | 31155.9 | 33970.2 | 25779.7 | 27246.3 | 29831.9 | 9070.9 | 8981.7 | 8924 |
Total | 129051.5 | 121988.3 | 127350.9 | 123458.3 | 116725.7 | 121814.2 | 37467.9 | 38434.2 | 38652 |
3.4.1. Installed capacity
The total installed capacity grew by 217,8 MW to 38,7 MW in 2015. The decrease in capacity of the RAO Energy Systems of the East Group by 57.7 MW was compensated by the commissioning of Gotsalinskaya HPP ( with the capacity of 100.0 MW) and Blagovesсhensk CHP (120.0 MW of capacity).
The growth of installed capacity also happened due to equipment remarking:
- Novosibirskaya HPP – by 5.0 MW;
- Kamskaya HPP – by 6.0 MW;
- Zhigulevskaya HPP – by 21.0 MW;
- Volzhskaya HPP – by 10.5 MW;
- Saratovskaya HPP – by 13.0 MW.
RusHydro Group has always occupied the first position in the rating of installed capacity among Russian power suppliers. The implemented investment programme gives grounds to expect it to save its leading position.
Installed capacity31,
MW
RusHydro electricity
production dynamics33, GW
RusHydro electricity supply dynamics33, GW
3.4.2. Electricity output
In 2015 electricity output grew by 5.36 billion kW·h (+ 4.5%) to 127,3 billion kW·h. Decrease of the electricity output of Zeyskaya HPP (-2,15 billion kW·h) was compensated for by the growth of the output of Boguchanskaya HPP (+ 4,72 billion kW·h) and at the plants of RAO Energy Systems of the East Group (+ 2,81 billion kW·h).
3.4.3. Electricity and capacity sales
For 2015 net sales of electricity and capacity by branches of PJSC RusHydro, which takes into account the purchase of electricity and capacity costs, increased by 2.9% y-o-y and amounted to 91 952.8 million rubles. The main factors that influenced the increase in revenue due to lower volume of electricity production by 2.7%:
- the growth of the DAM price in the second price zone due to:
- the growth of capacity purchase price at the КОМ for second price zone HPPs due to the liberalisation of the HPP capacity market dd. 05/01/2014;
- the indexation of adjustable electricity and capacity tariffs;
- the decrease of the amount and cost of purchasing electricity.
RusHydro net revenues changes, RUB mn
2014 | 2015 | Changes | Changes,% | |
---|---|---|---|---|
Sales | 107,296.8 | 105,923.0 | -1,373.9 | -1.3 |
- Cost of electricity sold | 76,532.4 | 73,262.4 | -3,269.9 | -4.3 |
- Cost of capacity sold | 30,678.2 | 32,582.6 | 1,904.4 | 6.2 |
- Services of Regional Distribution Grid Company | 86.3 | 77.9 | -8.4 | -9.7 |
Purchasing expenses | 17,975.5 | 13,970.2 | -4,005.3 | -22.3 |
- Cost of electricity purchased | 17,965.1 | 13,957.3 | -4,007.8 | -22.3 |
- Cost of capacity purchased | 10.4 | 12.9 | 2.4 | 23.2 |
Net revenue | 89,321.3 | 91,952.8 | 2,631.5 | 2.9 |
3.4.3.1. Electricity sales
Revenues in the DAM occupy the first position in the structure of the electricity sales revenues of the branches of PJSC RusHydro. Thereby, its share grew from 77.5% to 81.9% (+ 5,7%) in 2015 against the decrease of sales as per free bilateral contracts (FBC) by 29.% and the decrease of the volume of electricity sold in the balancing market (BM) by 7.1%.
RusHydro electricity sales and dynamics, RUB million
3.4.3.2. Capacity sales
The main part of revenue from sales of capacity by the branches of PJSC RusHydro is formed by contracts signed within the CPA. Following the results of 2015, the share of such contracts grew from 54.6% to 55.2% with the growth of corresponding revenue by 7.5%. 46 % growth was registered as per contracts on capacity provision. In 2015, revenue went down by 21% as per free bilateral contracts.
Capacity electricity sales and dynamics RUB million
Optimisation and increase of efficiency of operating activities
Pursuant to directive of the Government of Russian Federation no. 2303p-P13 dated 04/16/2015 on the decrease of operating costs (expenses), RusHydro Group implements a complex of measures aimed at the reduction of the index of the decrease of operating costs (expenses) by at least by 2% per annum starting from 2015.
The total effect of the implementation of such actions in 2015 (adjusted to meet inflation) against 2014 amounted to RUB 1.89 billion (adjusted to meet the actual rate of inflation), including RUB 0.64 billion of PJSC RusHydro (-3.9%) and AO – RUB 1.25 billion.
The total scheduled effect of the implementation of actions on the reduction of operating costs in 2016
Bln RUB | % of the level of 2015 including inflationary expectations | |
PJSC RusHydro | 3.73 | (-14 %) |
PJSC RAO Energy Systems of East | 5.23 | (-7 %) |
TOTAL by the Group | 8.96 | -9.20% |
RUB billion
operational expenditures
decreasing