January
- RusHydro and Power Machines sign agreements on replacement of hydropower units at the Votkinskaya and Rybinskaya HPP
February
- Russian Institute of Directors upgrades the corporate governance rating of PJSC RusHydro to the Best Practice of Corporate Governance1
June
- Yuri Trutnev, Deputy Chairman of the Russian Government, Plenipotentiary Envoy of President to the Central Federal District, is elected Chairman of the Board of Directors of PJSC RusHydro
- The capacity output of the Sayano–Shushenskaya HPP to the electric grid increased to 5,100 MW as a result of modernisation of automatic reliability system installed at the station
- RusHydro confirms the record high amount of dividends in its history – RUB 6.03 billion
July
- Boguchanskaya HPP reaches its design capacity of 2,997 MW allowing the plant to produce 17.6 TW·h of electricity per year
- Kamskaya HPP is the first power plant of RusHydro to finish modernisation of its hydropower equipment and came to design working hours of hydroelectric power station
September
- Nikolay Shulginov appointed Chairman of the Management Board – General Director of PJSC RusHydro
- 100 MW Gotsatlinskaya HPP is commissioned
December
- The construction of the first stage of the second phase of the Blagoveschenskaya CHP is completed, the new equipment increased the installed electric capacity of the plant by 120 MW and heat capacity by 188 Gcal/h
In 2015, the Company enhanced construction and installation works at the Yakutskaya TPP-2 (1st stage), CHP in Sovetskaya Gavan, and the Sakhalinskaya TPP-2 (1st stage).
As a result of implementation of Comprehensive Modernisation programme in 2015, the Company’s installed capacity increased by 55.5 MW including the growth of capacity of Volzhskaya HPP (10.5 MW), Zhigulevskaya HPP (21.0 MW), Saratovskaya HPP (13.0 MW), Novosibirskaya HPP (5.0 MW), and Kamskaya HPP (6.0 MW).
EVENTS AFTER REPORTING DATE (JANUARY – APRIL 2016)
January
- RusHydro and Voith Hydro signed an agreement providing the possibility of cost optimisation of the Saratovskaya HPP modernisation
- The interim results of tender offer for shares of PJSC RAO Energy Systems of the East were announced
February
- The most complicated stage of construction – the excavation of the unique derivation tunnel – is finished at the Zaramagskaya HPP-1
April
- RusHydro Group starts optimisation of its capital expenses
- RusHydro successfully closed a bid book for the exchange-traded bonds of series BO-P04 in total amount of RUB 15 bn. The coupon rate was set at 10.35% per annum – the lowest coupon rate among corporate marketable securities since June 2014
- The Bureya river in the Amur region was dammed up and the river now flows through the Nizhne-Bureyskaya hydropower plant. This was the most important stage of construction of the plant